Scott C. Mielke, P.E. · 30+ years on the Chesapeake

8348 Governor Ritchie Hwy, Pasadena · 410-798-1494

WEDC — Waterfront Engineering, Design & Construction Inc. — home
Call
Finished stone revetment along a mown waterfront lawn at Turkey Point, a WEDC project.

One engineer,three steps,every agency.

Site evaluation, engineering & permitting, and construction bidding & management, under one licensed P.E.

An engineer and a homeowner standing on an eroding waterfront bluff.

Step 01 — Evaluate

A licensed engineer walks your shoreline first.

Every WEDC project starts with an independent evaluation by a licensed professional engineer. Scott assesses the current condition of your property, works out what is failing and why, and develops a conceptual solution.

That evaluation goes to the design team as the brief for everything that follows — so the fix is engineered for your site, not chosen from a catalog.

Existing conditionsErosion & failure modeWater depth & exposureCritical-area bufferConceptual solution

Step 02 — Design & permit

Drawn for your site. Carried through every permit.

The conceptual solution is engineered into a site development plan: the existing site conditions, the proposed solution, and general construction specifications unique to your property and situation.

Once you have reviewed and approved the design plans, the project moves into permitting. WEDC prepares all of the necessary applications for every governing agency and works the permit process through to approval.

How permitting works, step by step
Hands holding site plans on a clipboard on a dock, bay water soft behind.
Chesapeake Bay Stone Reinforcement: filter fabric laid and granite placed against the Bay chop.

Step 03 — Bid & build

Bid to reputable contractors. Managed to final approval.

WEDC prepares the bidding documents and runs the bidding for you. They go to several local, licensed and reputable contractors, and you award the construction contract.

Project management is available through every phase of construction, from the first stone to the day the last final approval is received.

Chesapeake Bay Stone Reinforcement — filter fabric and stone placement

Expert testimony

  1. Annapolis Port WardensTestimony
  2. Anne Arundel County Board of AppealsTestimony
  3. Queen Anne’s County Board of AppealsTestimony
  4. Maryland Circuit & District CourtsExpert witness
  5. MDE · Army Corps · EPA · Fish & Wildlife · MD Historical TrustPresentations

Scott provides expert testimony and engineering reports for general litigation, regulatory issues, environmental impacts, safety of navigation and general design matters — before the City of Annapolis Port Wardens, the Anne Arundel and Queen Anne’s County Boards of Appeals, and in Circuit and District Court trials.

WEDC office8348 Governor Ritchie Hwy
Pasadena, MD 21122

Next step

Request a Site Evaluation

410-798-1494

Scott walks your shoreline before anything is drawn.