Scott C. Mielke, P.E. · 30+ years on the Chesapeake

8348 Governor Ritchie Hwy, Pasadena · 410-798-1494

WEDC — Waterfront Engineering, Design & Construction Inc. — home
Call
Stone steps and terraced retaining walls climbing a Severn River hillside from the water, a WEDC project.

Severn RiverBulkhead &Beach.

Bulkhead · Beach replenishment · Hillside stabilization

A failing hillside, terraced in stone.

On this Severn River property, a failed bulkhead was removed. In its place WEDC created a partial living shoreline and a replenished beach, and replaced a portion of the bulkhead.

Above the water, the existing steps to the shoreline were removed and replaced with stone steps and a system of retaining walls that stabilize the failing hillside.

Particulars

Waterway
Severn River
Type
Bulkhead, beach, living shoreline
Upland
Stone steps, retaining walls
Status
Complete

After photography only — no before on record

Adirondack chairs on the replenished Severn River beach below the new stone steps.
The new beach, below the stone steps
The new beach, stone and docks of a WEDC Severn River project, with boats moored beyond.

Beach replenishment & partial living shoreline

Hillside stabilization.

The wall that holds the hill, and the beach it made usable.

A stone retaining wall holding the hillside above a level lawn on the Severn River.
Retaining wall · hillside lawn
A stone-walled outdoor bar on the new Severn River beach.
Stone-walled bar · new beach

WEDC office8348 Governor Ritchie Hwy
Pasadena, MD 21122

Hillside slipping?

Request a Site Evaluation

410-798-1494

Scott walks your shoreline before anything is drawn.