Scott C. Mielke, P.E. · 30+ years on the Chesapeake

8348 Governor Ritchie Hwy, Pasadena · 410-798-1494

WEDC — Waterfront Engineering, Design & Construction Inc. — home
Call
Aerial of the Turkey Point living shoreline: a curved stone sill with a timber pier crossing it.

Turkey PointLiving Shoreline& Revetment.

2019 · Living shoreline · Stone revetment · Reconstruction

From a failing revetment to a living shoreline.

The existing revetment at Turkey Point was failing: stone had tumbled and scattered, the sandy edge behind it was eroding, and the marsh fringe was being cut back with every storm.

The project began with site inspections and a meeting with MDE on the shoreline itself. From there, WEDC engineered a reconstruction that pairs a rebuilt stone revetment with a stone sill and a planted living shoreline.

Phase 1 placed the stone under permit conditions — including a turbidity curtain to contain sediment. The finished work is a curved stone sill, a reconstructed revetment, and new marsh grass growing in behind the stone, with the pier crossing it all.

Particulars

Year
2019
Type
Living shoreline + revetment reconstruction
Agencies
MDE, USACE
Status
Complete
Turkey Point, 2019: the pier and worn lawn before work began.
Before · the pier and worn lawn
After: Turkey Point, 2019 — the finished stone sill with planted marsh behind it. Before: Turkey Point, 2019 — a failing sandy edge with tumbled stone. Before · 2019 After · 2019

At the sill: the failing edge, then the finished stone sill and planted marsh.

Turkey Point · 2019
Finished stone revetment along a mown waterfront lawn at Turkey Point, a WEDC project. Before: Turkey Point, 2019 — an eroding marsh edge with dark, scattered stone. Before · 2019 After · 2019

At the marsh edge: eroding bank, then finished stone along the lawn.

Turkey Point · 2019

The record, 2019.

Seventeen photographs taken from first inspection to final drone aerial. Ten of them, in order:

Turkey Point, 2019: the existing stone edge along a mown lawn before reconstruction.
Existing edge
Turkey Point, 2019: an excavator placing stone behind a yellow turbidity curtain.
Phase 1 · stone
Turkey Point, 2019: the stone sill taking shape along the sandy shoreline.
Phase 1 · sill
Turkey Point, 2019: a freshly placed rock toe against sandy fill.
Phase 1 · rock toe
Turkey Point, 2019: timber pilings standing in the water off the finished revetment.
Complete · pilings
Turkey Point, 2019: aerial of the finished revetment curving past the lawn.
Complete · aerial
Turkey Point, 2019: drone view looking down on the stone sill and the pier.
Complete · sill & pier
Turkey Point, 2019: finished stone revetment against deep blue Bay water.
Complete · stone
Turkey Point, 2019: the sill and pier with newly planted marsh.
Complete · planted marsh
Turkey Point, 2019: aerial of the finished curved revetment with planted marsh and the pier.
Complete · aerial

WEDC office8348 Governor Ritchie Hwy
Pasadena, MD 21122

A shoreline like this?

Request a Site Evaluation

410-798-1494

Scott walks your shoreline before anything is drawn.